W2BH Pipeline Project

SteelMains contracted LE to insert air valve and scour valve branches into approximately 240 lengths of 762mm x 12.2m long CLMS Pipe. We were privillaged to be given this opportunity by SteelMains because it gave us the opportunity to be trained the techniques of applying Sintakote and reinstating the internal concrete lining. SteelMains gave us great support and that allowed us to form a strong working relationship throughout the project and beyond.