Mica St Interconnecting Pipework

LE was engaged by John Holland Group to undertake the supply and installation of 762mm CLMS pipe for the Mica St Interconnection in Broken Hill as part of the Wentworth to Broken Hill Pipeline (W2BH) Project. The manufacture process included working with JHG’s engineers to design, supply workshop drawings, transitional fabrication of the 762mm pipe supplied by Steelmains, reinstating the concrete lining and reinstating the Sintakote lining. Together with JHG, LE successfully performed the site installation on a planned shut down limited to 12 hours due to Broken Hill’s water supply being shut off.